Kitchen Remodel Timeline: A Step-by-Step Guide
- Rudi Suminski
- Jul 20
- 2 min read
Kitchen remodel timeline typically varies depending on a number of factors, including the complexity of the execution, the preparation, and the size of the project. Our step-by-step guide will provide you with a realistic kitchen remodel timeline so you can have an overview of how long a kitchen remodel typically takes.
How Long Does a Kitchen Remodel Typically Take?
The duration of a kitchen remodel varies based on the project's scope and complexity. A small kitchen remodel, which focuses on cosmetic changes and minor upgrades, typically takes between 4 to 6 weeks to complete. This timeline includes planning, demolition, installation, and finishing touches.
For larger and more intricate projects, such as a full kitchen renovation involving layout changes and structural modifications, you can expect the timeline to extend to 8 to 12 weeks or more.
Here's a breakdown of the kitchen renovation timeline:
Kitchen Remodel Timeline
Planning and Design (typically 2-4 weeks)
Week 1-2: Initial Consultation and Goal Setting
Meet with contractors, designers, or architects to discuss your project goals, checklist, budget, and vision.
Gather inspiration and create a design brief.
Looking for new inspiration before a kitchen makeover? Look no further than these top Kitchen Remodel Ideas.
Week 3-4: Design Development and Planning
Work with professionals to develop a detailed design plan, including layouts, material selections, and fixtures.
Obtain necessary permits and approvals from local authorities if required.
Do I need a permit to remodel my kitchen? This Kitchen Remodeling Permit Guide specifies circumstances you need and don’t need one.
Demolition (typically 1-2 weeks)
Week 5-6: Demolition and Prep
Remove existing cabinets, countertops, flooring, and appliances.
Address any structural changes or repairs needed, such as plumbing or electrical updates.

Construction (4-6 weeks for small remodels, 8-12+ weeks for larger renovations)
Week 7-12: Construction and Installation
Install new cabinets, countertops, backsplash, and flooring.
Upgrade plumbing and electrical systems as needed.
Paint walls, ceilings, and cabinets.
Install appliances, fixtures, and hardware.
Apply finishes and complete any carpentry work.
Ensure that all work adheres to local building codes and regulations.
Finishing Touches and Project Handover (4-6 weeks)
Week 13-16: Final Touches, Clean-Up & Handover
Conduct a thorough inspection of the completed work to address any deficiencies or issues.
Apply final coats of paint, finishes, and complete all trim or detail work.
Ensure all appliances, fixtures, and lighting are fully installed and functional.
Test and confirm functionality of systems like plumbing and electrical.
Clear out debris and perform a thorough post-construction clean-up.
Conduct a final walkthrough to confirm everything meets expectations.
Receive all documentation, warranties, and maintenance instructions during handover.
Conclusion
While the duration of your kitchen renovation can vary based on factors such as project size, complexity, and unexpected challenges, having a general understanding of the timeline can help you set realistic expectations.
Remember that communication with your contractors and design professionals is key to staying on track. Regular updates and open discussions can help address any issues that may arise and ensure that your kitchen remodel stays within the established timeline.
In the end, the investment of time and effort in your kitchen remodel will be well worth it when you're enjoying your newly transformed, functional, and beautiful kitchen space.